Aggreko South Africa Milestones

Aggreko South Africa history

2002

  • 8 MW load bank package for the refurbishment of the Glas Dowr FPSO (Cape Town)

2006 

  • 10 MW of power for induction arc furnace for a major foundry

2008

  • 10 MW of power for mine operations (Mossel Bay)

2009

  • Opened a fully functional depot in Midrand
  • 14.7 MW of power for all venues at the FIFA Confederations Cup South Africa 2009

2010

To speak to one of our team in South Africa, please call

+27 11 357 8900

Send rental enquiry